Flowline Se Helmet W/Mips Radian Navy / Titanium

Regular price €113,99 EUR
Regular price €189,99 EUR Sale price €113,99 EUR
In stock Sold out
Skip to product information
  • Troy Lee Flowline SE Helmet W/MIPS Radian Navy / Titanium
  • Troy Lee Flowline SE Helmet W/MIPS Radian Navy / Titanium
  • Troy Lee Flowline SE Helmet W/MIPS Radian Navy / Titanium
  • Troy Lee Flowline SE Helmet W/MIPS Radian Navy / Titanium
  • Troy Lee Flowline SE Helmet W/MIPS Radian Navy / Titanium
  • Troy Lee Flowline SE Helmet W/MIPS Radian Navy / Titanium

Flowline Se Helmet W/Mips Radian Navy / Titanium

Regular price €113,99 EUR
Regular price €189,99 EUR Sale price €113,99 EUR
In stock Sold out

Colour:

Size:

Add €50,00 to cart to qualify for free shipping.

Be sure to stay safe on your bike rides with the Flowline SE Helmet from Troy Lee Designs. This half-shell helmet seamlessly combines safety, comfort and style. Enjoy reliable impact absorption and a breathable airflow system with the helmet's design. Plus, the easy-to-use magnetic buckle ensures a secure closure every time. Conquer the mountain bike trails, or city streets, with the Troy Lee Designs Flowline SE Helmet.

Specifications

- 3-Way adjustable screwless visor

- NTA-8776 certified for E-Bike usage

- MIPS B-Series Rotational Impact Brain Protection System

- Full 360-degree fit retention system with 3-way rear height adjustment

- 14 vents for maximum airflow

- Full wrap in-mold construction

- Extended Coverage MTB Trail Helmet

- Fidlock® Magnetic Buckle System

- Dual Density EPS for low and high-speed impacts

- Anti-microbial Quick Dry Premium Liner

- Side strap adjusters

- 5-Star Virginia Tech safety rating